UDCPR FSI Calculator

Here’s a clean, single-file HTML page that gives you an FSI (Floor Space Index) calculation table tailored for UDCPR (Maharashtra) workflows. It doesn’t hard-code any regulation values (which vary by zone, road width, amendments, etc.). Instead, you enter the Base FSI and any TDR / Premium / Incentive FSI as per the applicable UDCPR clause, and it calculates everything—permissible built-up, consumed FSI, balance FSI, and more.

UDCPR FSI Calculation Table (Maharashtra)

UDCPR FSI Calculation Table

Maharashtra – Planner’s worksheet (enter UDCPR-compliant values to compute built-up & balance FSI)

Inputs

Auto-computes Net Plot = Gross − Deductions
Enter the permissible Base FSI for your zone/road width
All values are “carpet-agnostic” gross built-up for FSI purposes. Verify UDCPR caps for your case.

FSI Calculation Table

Parameter Value Notes
Local Authority / Zone Record for submission/prints
Road Width (m) May influence FSI & building height as per UDCPR
Plot Area – Gross (sq.m) As per title/survey
Deductions (sq.m) Road set-back, reservations, RG, etc.
Net Plot Area (sq.m) Net = Gross − Deductions
Base FSI As per UDCPR clause for your case
TDR FSI As per eligible loading & caps
Premium FSI Subject to payment & road width limits
Incentive FSI GREEN/Transit/Accommodation, etc., if applicable
Total Permissible FSI Total FSI = Base + TDR + Premium + Incentive
Permissible Built-up (sq.m) Perm BUA = Net Plot × Total FSI
Existing Built-up (sq.m) To be retained/demolished as per proposal
Proposed Built-up (sq.m) Current proposal
Total Proposed+Existing BUA (sq.m) For FSI consumption
Consumed FSI Consumed FSI = (Existing + Proposed) / Net Plot
FSI Utilization (%) Utilization = Consumed / Total × 100
Balance FSI Balance = Total − Consumed
Additional Buildable Area (sq.m) Additional BUA = Balance × Net Plot
Status Shows OK / Warning if exceeding permissible
Disclaimer: This tool is a planning aid. UDCPR values (Base FSI, caps on TDR/Premium/Incentive FSI, road-width/zone conditions, height/margins, amenity/frontage rules, etc.) vary by authority and are updated through notifications. Always verify the inputs against the latest UDCPR and local authority circulars before submission.